亚投彩票开奖结果

欢迎您浏览网站,如有意见,请随时联系我们
021-5797-0178

北京联系电话:010-8710-3488

新闻
您现在的位置 亚投彩票开奖结果首页 > 新闻 > 公司新闻 > CENTRAL PROCESSING PLATFORM SUCCESS

CENTRAL PROCESSING PLATFORM SUCCESS

发布时间:2021/02/05 公司新闻 浏览次数:500

      Oliver Valves has been selected to supply a major offshore development project in the Malaysian part of the South China Sea for a Central Processing Platform. The current scope of this project is to supply over 541 Double Block and Bleed valves in a Flange by Screw and Flange by flange configuration, both soft and metal seated with the metal seated valves having a high temperature operation requirement of 340
degC.

      As part of this purchase order Oliver Valves will also carry out Finite Element Analysis to cover severe cycle as Heat from 25 degC to 260 degC total 50 mins/cycle. So, cycle times will then be 10,512 cycles/year.

      Scheduled to come on-stream in 2023, the offshore gas field is expected to produce up to 900 million cubic feet of gas (mcf) a day.

      Another major oil operator turning to Oliver for reliability in product and supply for their critical elevated temperature valve requirements!

021-5797-0178

websale@sawye.com